Construction of AL ADEL 380/110/13.8kV BSP

  • Client : Saudi Electricity Company Western Operating Area
  • Contract type : EPC Contractor-Contract # 4400001340
  • Area : Western Area
  • Project Status : Project OnGoing
  • Nature of Work : Construction of new indoor type 380kV GIS Substation consisting of, but not limited to, the following equipment, components and auxiliaries: 380kV GIS comprising of eighteen (18) units of 380 kV circuit breakers arranged in one and a half circuit breaker configuration. Two (2) nos. of 380kV Hybrid GIS, each comprising of one (1) unit of circuit breakers and two (2) units of disconnect switches. 110kV GIS comprising of thirty (30) units of 110kV circuit breakers arranged in a double-bus single breaker configuration. Four (4) nos. of 300/400/500MVA, ONAN/ONAF1/ONAF2 or OFAF, YNa0d1, 380/110/13.8kV, 3-phase, 60Hz, oil immersed Auto Power Transformers. Three (3) nos. of 50/67MVA, ONAN/ONAF1/ONAF2 or OFAF, YNa0d1, 110/13.8kV, 3-phase, 60Hz, oil immersed Power Transformers. One (1) no. of 380kV, 120MVAr, ONAN, Bus Shunt Reactors. Two (2) nos. of 380kV, 80MVAr Bus Shunt Reactors. All necessary metering, protection, SAS, control, communication and SCADA equipment, Fire Detection/ Alarm and Safety, Fire Protection system, Civil Work, Mechanical Work and Miscellaneous Requirements