Contract No. 21021017/00 – RAFHA POWER PLANT NO. 2

  • Client : Saudi Electricity Company Eastern Operating Area
  • Contract type : EPC Contractor
  • Area : Eastern Area
  • Project Status : Project Completed
  • Nature of Work : Title: RAFHA POWER PLANT NO. 2PROJECT PORTION-I: Adding Two (2) Gas Turbine Generator Units, having capacity each of 55-70MW, their associated auxiliaries and BOP as GTG Unit # 1 & 2 and 132 KV Substation which consisted of 132kV GIS, fifteen (15) bays. - Water Treatment Plant (Reverse Osmosis) designed as a single stream to Produce 100m3/day of potable water, De-Mineralized Water Treatment Plant designed to produce 70m3/day. PROJECT PORTION-II: Relocation of Two (2) Gas Turbine Generator Units GE Frame 6, Model # 6000B, their on-base and off base auxiliaries and associated equipment presently installed and in operating condition at existing Rafha Power Plant including dismantling, loading, transportation unloading and Installation & Re-Commissioning and put them back into service at New Rafha Power Plant # 2 (North East Region)