Contract No.30431083/00 – Installation of 69kV Underground & Fiber Optic Cables

  • Client : Saudi Electricity Company Eastern Operating Area
  • Contract type : EPC Contractor
  • Area : Eastern Area
  • Project Status : Project Completed
  • Nature of Work : Installation of 69kV Underground and Fiber Optic Cables Between Overhead to Underground Transition Tower and AL-MAHA 69/13.8kV Substation -Two (2) new 69kV Underground Cable Circuits (1x1Cx1200mm2, Copper Conductor, Cable per Phase) between the proposed overhead to underground Transition Tower, One (1) overhead to underground transition latticed steel tower, three (3)km, 12-core OPGW from transition tower to existing tower no.22