Construction of 380kV New Madinah BSP

  • Client : Saudi Electricity Company Western Operating Area
  • Contract type : EPC Contractor-Contract No.4400004132
  • Area : Western Area
  • Project Status : Project OnGoing
  • Nature of Work : Portion I NEW Madinah BSP Construction of New Indoor type 380kV GIS Substation consisting of but not limited to the following equipment, components and auxiliaries: 380kV GIS comprising of fifteen (15) units of 380kV circuit breakers arranged in one and a half circuit breaker configuration. 110kV GIS comprising of thirty (30) units of 132kV circuit breakers arranged in a double bus single breaker configuration. Four (4) NOS of 300/400/500MVA, ONAN/ONAF1/ONAF2 or OFAF, YNa0d1, 380/132/13.8kV 3 Phase, 60Hz, oil immersed Auto Power Transformers. Three (3) NOS of 50/67MVA, ONAN/ONAF1/ONAF2 or OFAF, YNa0d1, 110/13.8kV 3 Phase, 60Hz, oil immersed Power Transformers. One (1) NO of 380kV, 120MVAR, ONAN, Bus Shunt Reactors Expansion of Madinah North BSP by expanding one (1) 380kV GIS bay arranged in a double bus single breaker configuration with the major equipment. All necessary metering, protection, SAS, control, communication and SCADA equipment, Fire Detection / Alarm and safety, Fire Protection System, Civil work, Mechanical works and Miscellaneous Requirements. Portion II Extension of WADI FARA BSP Expansion of 380kV AIS at WADI FARA 380/110/13.8kV BSP by adding the following: One (1) NO of 380kV AIS New diameter (9 NOS 1 Pole Live Tanks CB) including disconnector Two (2) NOS 110kV AIS Line feeder (2 NOS 3 Pole Live Tanks CB) including disconnector One (1) NO of 75/100/125MVA, 400/120/33kV, 3-Phase, 60Hz, Oil Immersed Power Transformers All Necessary metering, protection, control, communication and SCADA equipment, Civil Work, Mechanical Work and Miscellaneous Requirements