Contract No.4400004549 RAFHA POWER PLANT 2 Extension I

  • Client : Saudi Electricity Company Eastern Operating Area
  • Contract type : EPC Contractor
  • Area : Eastern Area
  • Project Status : Project OnGoing
  • Nature of Work : RAFHA POWER PLANT 2 Extension I PROJECT PORTION-A: Engineering and Installation of One (1) Gas Turbine Generator Units, having capacity of 70MW, their associated auxiliaries and BOP as GTG Unit # 5 and ONE (1) ABB Generator Step-Up Transformer with all their related BOP and associated Auxiliaries - Fuel Oil Unloading System, Fuel Forwarding System, additional one(1) centrifuge, One (1) CO Storage Tank (15,000m3) with all their related BOP and associated Auxiliaries Complete Engineering will be done by KULJIAN/SSEM for basic and Conceptual Design. PROJECT PORTION-B: PORTION B: 132 kV XLPE Cables & Termination and Interfacing Work