Contract No.4400006050 – Installation of 115kV U/G Cables for the Integration of Al-Awamiyah-2 115/13.8KV Substation

  • Client : National Grid SA Eastern Operating Area
  • Contract type : EPC Contractor
  • Area : Western Area
  • Project Status : Project OnGoing
  • Nature of Work : Design, supply, testing, commissioning and installation of two (2) 115kV Underground cable circuits, consisting of one (1) 1x1C x1200mm2 Cu conductor, super clean-XLPE, Cu metallic sheath, cable per phase complete with all other accessories, along the proposed route from the existing Qatif 115/13.8kV Substation #2 up to Al-Awamia 115/13.8kV Substation #2. Approximate route length between the two locations is 5.49 km.