Contract No.4400006060 – Installation of 115kV U/G Cables for Az-Zuhoor-2 115/13.8KV Substation

  • Client : National Grid SA Eastern Operating Area
  • Contract type : EPC Contractor
  • Area : Eastern Area
  • Project Status : Project OnGoing
  • Nature of Work : Design, supply, testing, commissioning and installation of two (2) 115kV Underground cable circuits, consisting of one (1) 1x1Cx2000mm2 super clean-XLPE, Cu conductor, cable per phase complete with all other accessories, along the proposed route from Al-Khudriyah SIS No. 2 up to Az-Zuhoor 1151/13.8kV Substation No. 2. Approximate route length between the two locations is 8.3km