Construction of DUBA No.1 Integrated Solar Combined Cycle Power Plant Projects

  • Client : Saudi Electricity Company Western Operating Area
  • Contract type : EPC Contractor -Contract No.4400006645
  • Area : Eastern Area
  • Project Status : Project OnGoing
  • Nature of Work : Construction of DUBA No.1 Integrated Solar Combined Cycle Power Plant Projects which consist of Two (2) Portions: PORTION-1: Construction of a Combined Cycle in configuration 2+2+1 (Two 2 Gas Turbines, Two 2 Steam Recovery Boilers and One 1 Steam Turbine with an Integrated Solar Field with Total Power of 565MW. PORTION-2: Construction of DUBA Green Power Plant 380/132kV Substation with all necessary protection, metering, control, communication, SCADA, SAS, Civil Works and Associated equipment and Construction of 380kV Underground Cables from 380kV GIS up to Step Up Transformer at DUBA Green Power Plant 380/132kV Substation