Royal Commission 108-C01 Construction of Pumping Station

  • Client : Royal Commission
  • Contract type : EPC Contractor
  • Area : Eastern Area
  • Project Status : Project OnGoing
  • Nature of Work : Construction of Pumping Station & Potable Water Tanks Phase II P&C of Potable Water Pumping Station and Storage Tanks Project is located in the Royal Commission Industrial City (RIC). The Scope of Work for Phase 1 Consist of the following: Total covered area of approximately 160,460m2 and includes site development and associated buildings. Four (4) NOS vertical steel water storage tanks each of capacity 42,500m3 Pumping Station with four (4) NOS main pumps of capacity 1,700m3/hr & 600m3/hr with suction & discharge piping Chlorination System with related accessories. RTRP & Ductile Iron intercooling piping and valve chambers for sizes ranging from DN200 to DN1200. Four (4) NOS Diesel Generators Electrical and I&C System with related accessories