KAIA – King Abdul Aziz International Airport (PACKAGE 2) LOT 1 – AIRPORT Substation C

  • Client : General Authority of Civil Aviation (GACA)
  • Contract type : EPC Contractor
  • Area : Jeddah
  • Project Status : Project OnGoing
  • Nature of Work : Construction of fully automated (IEC 61850) new 110/13.8kV substation with three (3) NOS incoming 110kV feeder bays, six (6) NOS 110kV Transformers, six (6) NOS 7MVAR 13.8kV Shunt Capacitor Bank along with two (2) independent 13.8kV Switchgear (C-1 & C-2) complete with Protection, Substation Automatic System (SAS), SCADA, LDC, Telecommunication System, Civil Works, HVAC & Fire Alarm, Detection & Protection System LOT 2 – Installation of 110kV Power & NFOC for 110/13.8kV Airport Substation C Design, Supply, Installation, Testing and Commissioning of 110kV XLPE, three (3) Circuit each having (3x1 cx1200mm). Underground XLPE cables and three (3) 96 core Non-Metallic Fiber Optic Cable (NFOC) from 380/110kV Jeddah North BSP to 110/13.8kV Substation Airport C. Route Length of each power and fiber optic cable is approximately 1,450meters